2025 Week 8 Windmill by farinare Windmill footings Well 2 windmill mixing concrete Colin tidying the soil around the new footings Everything bolted together Starting the lift Guiding the windmill with Kevin lifting Well 2 Overhead Well 2 and windmill overview Drilling holes for the bolts Installing bolts Bill posing in front of the windmill All done